EasyManua.ls Logo

Jacobsen Greens King 522 E - SET UP; INITIAL INSPECTION

Jacobsen Greens King 522 E
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 SET UP
GB-5
4 SET UP
4.1 GENERAL________________________________________________________________
The set-up and testing of the unit should always be
performed by a trained technician, familiar with the
operation of the equipment.
Read each instruction completely and make sure you
understand it before proceeding with the assembly. Stay
alert for potential hazards and obey all safety
precautions.
The RIGHT, LEFT, FRONT and REAR of the machine are
referenced from the operator’s position, facing forward.
Add a front roller or other accessories as specified by the
end user. Use the installation instructions provided with
the accessory.
This machine requires assembly of the battery pack..
After assembly, perform the operating checks, and test
the Operator Presence Control (OPC). Follow Pre-
Delivery Checklist.
4.2 INITIAL INSPECTION_______________________________________________________
1. Perform a visual inspection of the entire unit, look for
signs of wear, loose hardware, and components that
may have been damaged during transport.
2. Inspect paint and decals for damage or scratches.
Decals provide important operating and safety
information. Replace all missing or hard to read
decals.
3. Check tires for proper inflation. Tires have been over
inflated for transport. Correct tire pressure should be
set to: 6 - 8 psi (41.3 - 55.1 kPa)
4. Inspect lube points for proper lubrication.
CAUTION: Do not attempt to operate the
machine unless you are familiar with this type of
equipment and know how to operate all controls
correctly.
!
CAUTION: The initial inspection should be performed only when the power connector dissconnected.
!