EasyManua.ls Logo

Jacuzzi J-SHOWER TOWERTM - Fixed Panel Assembly

Jacuzzi J-SHOWER TOWERTM
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Locate the bottom rail and the fixed panel. Lay a bead
of sealant on the bottom of the fixed panel. Secure the
bottom rail to the fixed panel. (See Illustration 12.) Drill
a 3/32" diameter hole into the bottom rail at about 15°.
Drill only through the first aluminum thickness. (See
Illustration 13.) Secure the front of the fixed panel to
the bottom rail. (See Illustration 14.) Clean off excess
sealant.
15
15°
ILLUSTRATION 14
ILLUSTRATION 12
ILLUSTRATION 13
H8
15°
1/8"
IMPORTANT:
MUST DRILL AT 15°
ANGLE TO AVOID
DRILLING THROUGH
DOOR GUIDE AREA.
IMPORTANT:
MUST DRILL AT 15°
ANGLE TO AVOID
DRILLING THROUGH
SIDE OF RAIL.
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
LOCATED IN HARDWARE KIT
LOCATED IN HARDWARE KIT
FIXED PANEL TO BOTTOM RAIL
DRILLING FIXED PANEL
DRILLING FIXED PANEL
DOOR GUIDE
AREA
M4.2X19MM
STAINLESS STEEL
SCREW
QTY.-2
H8
H9
H9
FIXED PANEL
BOTTOM RAIL
LAY A 1/4" BEAD OF
SEALANT UNDER THE
FIXED PANEL
TWO
SCREWS

Related product manuals