Page 3
Section 1. Safety Information ...................... 4
Section 2. General Installation
Requirements ............................. 5
2.1 Water Source ........................................... 5
2.2 Pump ....................................................... 5
2.3 Plumbing ................................................ 5
2.4 LED Light Module .................................... 5
2.5 Conduit/Fiber Optics Module ................... 5
2.6 Critical Placement Dimensions ................ 5
Section 3. Installing the Deck Canister ...... 7
3.1 In-Deck Installation .................................. 7
3.2 Out-of-Deck/Planter Box Installation ....... 8
3.3 Pressure Test Water Lines ....................... 8
3.4 Flush Water Lines .................................... 8
Section 4. Laminar Jet with LED Light
Installation (Use with Model
JLLED) ......................................... 9
4.1 Preparing the Laminar Jet with LED
Light for Installation ................................. 9
4.2 Installing the Laminar Jet with LED Light 9
4.3 Wiring Options for Controlling Laminar Jet
with LED Lights ....................................... 9
4.3.1 Wiring to an AquaLink
®
RS
Control System .......................... 9
4.3.2 Wiring to a Time Clock ............... 10
4.3.3 Wiring to a Switch ...................... 10
4.4 Twelve (12) Volt Transformer Installation . 10
Section 5. Laminar Jet with Fiber Optic
Module Installation (Use with
Model JLFBR) ............................. 11
5.1 Items Required ........................................ 11
5.2 Installation ............................................... 11
Section 6. Starting the System ................... 11
6.1 Install Jet Assembly ................................. 11
6.2 Set up Jet ................................................ 11
Section 7. Operating the Laminar Jet with
LED Light .................................... 12
7.1 To Operate the Light and Change Colors 12
7.2 To Reset to the Beginning of the Color
Sequence ................................................ 13
Section 8. Light Intensity Set Up ................ 13
8.1 Light Intensity Adjustment Set ................ 13
Section 9. General Maintenance and
Troubleshooting ......................... 14
9.1 Clogged Nozzle ....................................... 14
9.2 Winterization ............................................ 14
Section 10. Parts List and Exploded View ... 14
10.1 Parts List ................................................. 14
10.2 Exploded View ......................................... 15
Table of Contents