EasyManua.ls Logo

Janus Sv Series - Finalization Procedure

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page: 22
FM-200® FILL MANUAL
Revision B
Document # DOC180
Issued: August 16, 2010
Revised: April 2, 2012
Section 4 Fill Procedure
4.3.1 Finalization Procedure
Upon reaching an internal cylinder assembly pressure of 360 psig at 70°F (refer to Table B.1 located in
Appendix B for intended cylinder pressures adjusted for ambient temperatures other than 70°F), the
following steps shall be performed.
• Let the cylinder assembly stand for three hours. Once this three hour period has been completed, check
the cylinder assembly for leak using a soap solution.
• Check the cylinder pressure gauge using the pressure/temperature chart located in the appendix of this
manual.
• Weigh cylinder assembly and record this nal weight on the cylinder label and ll log as full weight.
• Properly secure the cylinder assembly for storage or shipping.

Related product manuals