EasyManua.ls Logo

Janus FM-200 Sv Series User Manual

Default Icon
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
FM-200® Operation, Design,
& Service Manual
Sv Series, Mv Series, Lv Series
Issued February 1, 2009
DOC102 REV F
40YE

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Janus FM-200 Sv Series and is the answer not in the manual?

Janus FM-200 Sv Series Specifications

General IconGeneral
AgentFM-200 (HFC-227ea)
TypeClean agent fire suppression system
Cylinder MaterialSteel
Operating Pressure25 bar (360 psi)
ApprovalsUL, FM
Nozzle Types360-degree, 180-degree
ApplicationData centers, telecommunication facilities, museums, archives
Operating Temperature Range-20°C to 50°C
Storage Pressure25 bar (360 psi)
Discharge Time10 seconds
ApplicationsData centers, telecommunication facilities, museums, archives
Extinguishing MethodChemical suppression by heat absorption and breaking the fire triangle

Summary

1 General Information

1.3 Safety Considerations

Covers safety aspects, exposure limits, and handling precautions for FM-200®.

2 System Description and Components

2.1 Cylinder Assembly

Describes the cylinder, dip tube, and valve assembly.

2.2 Trim Components

Lists components that complete the system setup regardless of cylinder count.

2.6 Discharge Nozzles

Components used to disperse the FM-200® agent into the protected area.

3 System Design

3.1 Hazard Analysis

Identifies unique requirements of the area to be protected.

3.2 Agent Requirement

Calculates the required amount of FM-200® agent based on volume and concentration.

3.4 Cylinder Location

Specifies requirements for locating cylinders in a climate-controlled, accessible, and vibration-free area.

3.5 Nozzle Determination

Determines nozzle placement, arrangement, and selection based on hazard configuration.

4 System Installation

4.1 Mechanical Installation

Covers the physical installation of system components like brackets and piping.

4.2 Electrical Installation

Details the procedures for electrical wiring and component installation.

5 Commissioning System

5.1 System Review

Verifies system installation and operation through checks like room integrity tests.

6 System Inspection and Maintenance

7 System Recharge and Reset

7.2 Recharging

Procedures for removing, cleaning, refilling, and pressurizing cylinders.