Section II: Operation
Page 48
5-376-000086
REV. 4 - 07/10
TOW SLING OPERATION
(OPTIONAL)
Sling Rating: (50 M.P.H. Transport Speed)
Single Line Boom ................................... 4,000 lbs.
Dual Line Boom...................................... 4,000 lbs.
If your MPL40 is equipped with a towing sling, consult the AAA
Towing Manual for hook up and follow these steps:
1. Position the truck within 9 ft.
of the subject vehicle and as
close to the direction of the tow
as possible.
2. Unfold the underlift.
9 FT

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jerr-Dan MPL40 and is the answer not in the manual?

Jerr-Dan MPL40 Specifications

General IconGeneral
BrandJerr-Dan
ModelMPL40
CategoryUtility Vehicle
LanguageEnglish