Do you have a question about the JLG 2505 and is the answer not in the manual?
Weight | I don't know |
---|---|
Drive Type | Electric |
Max Working Height | 8.00 m |
Maximum Lift Height | 6.00 m |
Maximum Platform Height | 6.00 m |
Platform Length | 1.2 m |
Platform Width | 0.8 m |
Instructs to place tags on ignition and steering wheel before service/maintenance.
Highlights the importance of complying with safety messages to avoid death or injury.
Provides general safety statements to consider before performing maintenance procedures.
Lists capacities and types of fluids for engine, axles, brakes, and hydraulic systems.
Outlines scheduled maintenance tasks for various hour intervals.
Provides a diagram for 250-hour lubrication points.
Presents torque values for SAE and metric fasteners based on grade, lubrication, and coating.
Provides instructions for assembling NPTF pipe threads, including torque and turns from finger tight.
Details assembly instructions for BSPT pipe threads, including torque and turns from finger tight.
Explains assembly for JIC flare fittings, including torque and flats from wrench resistance.
Provides instructions for assembling 45° SAE flare fittings, including torque specifications.
Details assembly procedures for ORFS fittings, including torque and lubrication.
Explains assembly for DIN 24° flare bite type fittings, including torque and flats from wrench resistance.
Covers assembly instructions for bulkhead fittings, including torque values.
Provides assembly instructions for ORB fittings, including torque values for various types.
Details assembly instructions for adjustable port end metric fittings, including torque values.
Explains assembly for metric ISO 6149 port assembly stud ends, including torque values.
Provides assembly instructions for adjustable port end BSPP fittings, including torque values.
Outlines assembly instructions for flange connections FL61 and FL62, including torque values for inch fasteners.
Details general maintenance procedures for the boom assembly.
Provides step-by-step instructions for removing the second boom section.
Details the procedure for removing the first boom section from the machine.
Offers solutions for common boom-related problems, causes, and remedies.
Provides instructions for removing the operator's cab, including disconnecting hoses and wiring.
Guides through the process of installing the operator's cab, including alignment and torque specifications.
Addresses common problems with axle assemblies and drive shafts, their causes, and remedies.
Details engine removal procedures, including disconnecting systems and fluid drainage.
Offers solutions for common engine problems, their causes, and remedies.
Provides general steps for conducting pressure checks and adjustments in hydraulic circuits.
Details how to check and adjust main control valve pressure.
Explains how to check charge pressure on the hydrostatic transmission.
Guides on checking pressure for individual boom function circuits.
Details how to check steering system pressure and individual valve section pressures.
Covers analysis of implement pump failure and replacement procedures.
Covers removal, disassembly, cleaning, inspection, assembly, installation, and testing of various valves.
Covers main control valve removal, disassembly, cleaning, inspection, assembly, installation, and testing.
Covers removal, installation, and calibration of the Load Stability Indicator (LSI).
Lists torque specifications for various hydraulic cylinder components.
Covers testing, removal, cleaning, and installation of the starter motor.
Discusses charging the battery and checking the alternator.
Explains the function of the LSI and notes it is not serviceable.
Provides detailed steps for calibrating the Load Stability Indicator (LSI).