7 Installation
7.1
Locate the autoclave close to an appropriate power source.
7.2
The autoclave needs to be placed on a flat stable horizontal sur-
face, leaving a minimum space of 10 cm around the instrument.
7.3
Adjust the front feet to level the autoclave and set the autoclave
in position.
7.4
Fix a plastic or rubber hose to the pump output connection (24)
with a receptical to collect any condensate produced by the at-
mospheric purge.
8 Operation
8.1
Opening the Lid
-
The autoclave must be connected to mains supply and the main
switch turned on.
-
Pressure gauge: 0 bar
-
Temperature in the internal chamber must be under 95ºC.
-
The steam manual valve (16) must be opened.
ONLY WITH THIS CONDITIONS LID IS READY TO OPEN
8.2
Start
-
Start on using the main switch (18)
-
Open the lid as we can see on 8.1 section, using the handle (17)
-
Place the shelf at the bottom of chamber.
-
Be sure the valve (15) is closed.
-
Fill of decalcified water until shelf level.
-
Put the material to sterilize and close the lid.
-
Close the manual emptying valve (16)
-
Start the cycle as shows the section 8.3