C 1
0999.GB
C Transportation and commissioning
1 Transportation by crane
f
Only use lifting equipment with sufficient bearing capacity (loading weight see identi-
fication label on truck).
A
A hoisting point (1) is provided at the hoist frame for loading the truck with the help of
hoisting gear.
Park the truck and render it safe
(refer to chapter E).
Attach the hoisting gear to the stop (1)
on the hoisting mast.
m
Secure the hoisting gear to the hoisting
points ensuring that the hoisting gear will
not slip! The hoisting gear must be atta-
ched in such a way that it does touch any
add-on parts while the truck is being lif-
ted.
2 First commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
f
It is prohibited to hoist loads when the truck is operated via a towing cable with an
external battery.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
Check whether the equipment is complete and in perfect condition.
If required, mount the battery, make sure not to damage the battery cable
(see chapter D).
Load the battery (see chapter D).
If required, check whether the settings of the combined instrument correspond to
the battery (see chapter D).
Commission the truck as prescribed
(see chapter E).
A
If the truck is parked for longer periods, the running surfaces of the wheels may be
flattened. However, this flattening will disappear quickly when the truck is being
driven.
1
C 1
0999.GB
C Transportation and commissioning
1 Transportation by crane
f
Only use lifting equipment with sufficient bearing capacity (loading weight see identi-
fication label on truck).
A
A hoisting point (1) is provided at the hoist frame for loading the truck with the help of
hoisting gear.
Park the truck and render it safe
(refer to chapter E).
Attach the hoisting gear to the stop (1)
on the hoisting mast.
m
Secure the hoisting gear to the hoisting
points ensuring that the hoisting gear will
not slip! The hoisting gear must be atta-
ched in such a way that it does touch any
add-on parts while the truck is being lif-
ted.
2 First commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
f
It is prohibited to hoist loads when the truck is operated via a towing cable with an
external battery.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
Check whether the equipment is complete and in perfect condition.
If required, mount the battery, make sure not to damage the battery cable
(see chapter D).
Load the battery (see chapter D).
If required, check whether the settings of the combined instrument correspond to
the battery (see chapter D).
Commission the truck as prescribed
(see chapter E).
A
If the truck is parked for longer periods, the running surfaces of the wheels may be
flattened. However, this flattening will disappear quickly when the truck is being
driven.
1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jungheinrich EJB 14 and is the answer not in the manual?

Jungheinrich EJB 14 Specifications

General IconGeneral
BrandJungheinrich
ModelEJB 14
CategoryTrucks
LanguageEnglish

Related product manuals