EasyManuals Logo

Juniper Day One+ MX304 User Manual

Juniper Day One+ MX304
13 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
SFP transceiver dust cover and QSFP transceiver dust cover
An electrostac discharge (ESD) grounding strap
Grounding lug (Panduit LCD6-14A-L or equivalent) and screws
What Else Do I Need?
Someone to help you secure the router to the rack
Phillips (+) screwdrivers, numbers 1 and 2
Management host such as a laptop or desktop PC
Serial-to-USB adapter (if your laptop or desktop PC doesn’t have a serial port)
Grounding cable #6 AWG (4.11 mm²) stranded wire
Install the MX304 Router in a Four-Post Rack
Here's how to install the router in a four-post rack or a cabinet:
CAUTION: If you're installing more than one router in a rack, install them from the boom up.
CAUTION: Before front-mounng the router in a rack, have a qualied technician verify that the rack is
strong enough to support the router's weight and is adequately supported at the installaon site.
CAUTION: Liing the chassis and mounng it in a rack requires two people (one person to hold the
router in place and a second person to install the screws). A fully loaded AC-powered router weighs up
to 70.54 lb (32 kg).
1. Review the General Safety Guidelines and Warnings.
2. Wrap and fasten one end of the ESD grounding strap around your bare wrist, and connect the other end to a site
ESD point.
3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper Day One+ MX304 and is the answer not in the manual?

Juniper Day One+ MX304 Specifications

General IconGeneral
ModelMX304
CategoryNetwork Router
Operating SystemJunos OS
Power SupplyDual redundant AC or DC power supplies
Operating Temperature0° to 40° C (32° to 104° F)
Storage Temperature-40°F to 158°F (-40°C to 70°C)
Humidity5% to 90% non-condensing

Related product manuals