6
5. Turn upright. Secure
power cord to rope hole
OR
With Strain Relief
Without Strain Relief
6. Choose Nozzle. Fit bolt
into the molded socket
on the nozzle and thread
into the inner cone of
the pump.
7. Thread one rope through one weighted tube rope Weight
and position it approximately 6’ from the oat. Next,
thread the end of the rope back through the opening facing
the oat (as shown). Repeat with the second rope and
weight.
8. If ready to install in the pond, go to Installation instructions. Light
Kits can also be installed at this time, go to Light kit instructions.