EasyManua.ls Logo

kayse LS30 - Page 24

kayse LS30
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LS30 CONTROLLER INSTALLATION AND OPERATING GUIDE
24
5.3 Adjustment of Reference Values Independent of Level Con-
trol Equipments
When the LS30 and MLG30 Level Control Equipments are not
intervened by hand adjust the reference values as follows;
By opening approximately 5-6 mm of two ends of 10 cm cable
piece and prepare it (It should be max 1,5 mm
2
cross secon
for easy asasembly).
For accurate are installing of cables properly to the triple ter-
minal that the cable connecon is made (terminal 1-3) remove
them in order to avoid confusion,
Install one end of cable piece prepared to terminal 2 and other
end to terminal 3.
The top point of
oat and up-
per connecon
pipe centers are
brought into the
same line.
(ATTENTION :
The oat should be
kept in a manner
its magnec part
facing upward. For
determinaon of
magnec part an
iron material can
be used).