5.3 Adjustment of Reference Values Independent of Level Con-
trol Equipments
When the LS30 and MLG30 Level Control Equipments are not
intervened by hand adjust the reference values as follows;
By opening approximately 5-6 mm of two ends of 10 cm cable
piece and prepare it (It should be max 1,5 mm
2
cross secon
for easy asasembly).
For accurate are installing of cables properly to the triple ter-
minal that the cable connecon is made (terminal 1-3) remove
them in order to avoid confusion,
Install one end of cable piece prepared to terminal 2 and other
end to terminal 3.
The top point of
oat and up-
per connecon
pipe centers are
brought into the
same line.
(ATTENTION :
The oat should be
kept in a manner
its magnec part
facing upward. For
determinaon of
magnec part an
iron material can
be used).