05
INSTALLATION INSTRUCTIONS
TRIPLE TRAINER
SECURING THE TRIPLE TRAINER
• Keiser Professional Installation Service. A trained technician from Keiser’s installation network will perform the
installation.
• Choose Your Own Professional Installation Service. Keiser Installation Instructions provide detailed instructions on
how to install the equipment into solid concrete, along with information on the proper tools and hardware required.
IMPORTANT: A site survey for equipment installation is required. It is the responsibility of the customer to ensure that a
site survey is performed. To obtain a Site Survey Form, contact Keiser Customer Support by telephone at 1 559 256 8000,
online 24/7 at keiser.com/support, or by email at service@keiser.com.
MOUNTING REQUIREMENTS
INSTALLATION OPTIONS
• Professional installation is required by qualied personnel as dictated by authority having jurisdiction.
• It is recommended that a high-quality oor/wall scanner be used to detect and avoid drilling into rebar, pipes, live
wires, etc., that may be present within the concrete ooring.
• All screws and/or anchor bolts installed into the concrete oor must reach minimum embedment as specied by the
manufacturer to ensure design values are kept.
• Always follow manufacturer’s safety and installation instructions.
• Tighten all bolts and carefully examine your installation prior to use of the Triple Trainer to ensure that it is securely
fastened in place.
WARNING: AVOID SERIOUS INJURY AND/OR PROPERTY DAMAGE.
To mount the Triple Trainer into concrete oor, refer to Figure 3 and ensure the following requirements are met:
1. Installation must be directly onto LEVEL, SOLID CONCRETE
FLOOR, minimum 5 inches (127 mm) thick.
IMPORTANT: If the oor is covered (wood, carpet, rubber,
etc.), cut out the Floor Mount Plate pattern to mount directly
onto concrete.
2. The Floor Mounted Triple Trainer must be installed with the
Triple Trainer Mount Plate.
• Ensure that the Triple Trainer Mount Plate makes full
contact with the mounting surface (no gaps).
3. All screws and/or anchor bolts installed into the concrete
oor must reach minimum embedment as specied by the
manufacturer to ensure design values are kept.
• Be sure a wire tube brush, along with a vacuum, is used
to clean/clear debris from drilled holes to ensure that the
required hole depth is met.
Figure 3. Floor Requirements
Level, solid concrete oor
Min. 5 inches (127 mm) thick
GOOD