EasyManua.ls Logo

King-Meter NOKEE - Normal Operations; Power On and Off

King-Meter NOKEE
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KING-METER SPECIFICATIONS OF NOKEE V1.0
6.
Normal
operations`
6.1
Power
on/off
Press the key for several seconds to initiate the meter
and
supply
power
to
the
controller.
Press
the
key for
several seconds while the power is on to turn off the e-bike.
While the
power
is
off,
the
meter
will
no
longer
consume battery power
and
the
leakage
current
is less than
1uA.
The
meter
will
automatically
shut
down
if
the
e-bike
is
idle
for
over
10
minutes.

Related product manuals