18
4
0
0
S
E
R
I
E
S
W
a
t
e
r
C
Y
C
L
E
R
M
e
t
e
r
e
d
P
o
o
l
P
u
r
i
f
i
e
r
4
0
0
S
E
R
I
E
S
W
a
t
e
r
C
Y
C
L
E
R
M
e
t
e
r
e
d
P
o
o
l
P
u
r
i
f
i
e
r
4
0
0
S
E
R
I
E
S
W
a
t
e
r
C
Y
C
L
E
R
M
e
t
e
r
e
d
P
o
o
l
P
u
r
i
f
i
e
r
7.
8.
9. 10.
11. 12. 13.
14. 16.15.
17.
For best results use Phillips
pan head screws through the
mounting holes at the Cycler
base to secure the Cycler into
a treated wood base.
If using the chlorine Bac Pac, isolating the Cycler
by installing a corrosion resistant check valve is
recommended.
2 Inches apart
Attach a gasket to
each scoop.
Place scoops
inside holes so the
inlet scoop faces
the water flow and
the outlet scoop
faces away from
the water flow.
Scoop arrows
should be facing
each other when
correct.
Tighten scoop clamps
with a screwdriver.
When pipe is
totally dry,
drill two 19/32" or
5/8" holes
2" apart on the
return line. Be
careful not to go
through other side
of pipe.
Screw elbow into reducer
bushings on both sides.
Cut tubing
to size for
each Cycler
connection
and attach
one to
each
elbow with
clamps.
Attach scoop clamps over the
scoops and around the pipe.
Attach each hose
to venturi scoop
male nipple with a
small clamp and
tighten with
screwdriver.
Tighten clamps
with screwdriver.
Arrows on scoops must
face each other.
W
a
t
e
r
C
Y
C
L
E
R
M
e
t
e
r
e
d
P
o
o
l
P
u
r
i
f
i
e
r
S
e
e
S
e
t
t
i
n
g
C
h
a
r
t
i
n
M
a
n
u
a
l
1
2
3
4
5
6
7
8
P
R
E
C
I
S
E
M
E
T
E
R
I
N
G
F
O
R
M
O
D
E
L
5
4
0
0
Pac
Removal
Maximum