TEST OPERATION
Preparation
The client approves the air conditioner.
Specify the important notes for air conditioner to the client.
Method of Test Operation
Put through the power, press ON/OFF button on the remote controller to start
operation.
Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to check whether
the operation is normal or not.
Note: If the ambient temperature is lower than 16°C, the air conditioner can’t start
cooling.
CONFIGURATION OF THE CONNECTION PIPE
1. Standard length of connection pipe
5 m / 7,5 m / 8 m
2. Min length of connection pipe
For the unit with standard connection pipe of 5m, there is no limitation for the min
length of connection pipe.
For the unit with standard connection pipe of 7.5m and 8m, the min length of
connection pipe is 3m.
3. Max length of Connection Pipe
The maximum length of the connection line depends on the capacity of the air
conditioner (see table below).
Capacity Max. length Capacity Max. length
5.000 BTU/h (1465 W) 15 24.000 BTU/h (7032 W) 25
7.000 BTU/h (2051 W) 15 28.000 BTU/h (8204 W) 30
9.000 BTU/h (2637 W) 15 36.000 BTU/h (10548 W) 30
12.000 BTU/h (3516 W) 20 42.000 BTU/h (12306 W) 30
18.000 BTU/h (5274 W) 25 48.000 BTU/h (14064 W) 30