KODAK 9000 3D Extraoral Imaging System_Installation Guide (SM711)_Ed 01 6–1
Chapter 6
INSTALLING THE UNIT
Tool Requirements
The installer must supply the following tools:
• Power drill
• Screws and heavy duty fixings
• Spirit level
• Measuring tape
• Cutter
• Metric Allen keys
• Metric spanners
Technical Staff Requirements
The installation requires the following number of technicians:
IMPORTANT
The tool references mentioned in this manual are ISO tool
references.
Unit Component Technicians
Head 3
Column 2
Fixed arm 2