EasyManua.ls Logo

Koden MDC-5225 - Chapter 4 Setup After Installation

Koden MDC-5225
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MDC-5200/5500 Series Chapter 4 Setup after installation
0092655002-03 4-1
Chapter 4 Setup after installation
Some setup procedures are required after system installation. Before performing the setup procedures,
please check the following items for normal operation:
(1) The onboard power supply powering the radar system has the specified voltage.
(2) No one is in the area around the Antenna unit on the mast. The indication “Under the radar
coordination, do not touch the Operation unit.” is marked on the Display unit.
Please execute the items in the [MAINTENANCE] menu to the equipment adjustment in the following
order.
STARTUP TUNE, HL OFFSET, TX DELAY, ANT HEIGHT, ANT CABLE, MBS,
SEA CURVE, FUNCTION KEY, RANGE ENABLE, TIMES ENABLE,
LOGO, MOTOR HIGH SPEED, MOUSE SPEED
I/O Serial interface setting with other equipments.
SECTOR MUTE Setup sector mute mode ON or OFF, START and END position.
PRESET Setup RAIN min and max, SEA min and max, GAIN min and max, GAIN offset and
SEA offset.
BACKUP How to save and load BACKUP data.
BITE System hardware check.
TOTAL HOUR Confirmation of the power on time of this system and, reset the time.
TX HOUR Confirmation of the transmission time, and reset the time.
MENU SETUP Setup menu item display on or off.
VERSION Confirmation of installed software version.

Table of Contents