- 32 -
17.4. Auto time study (Press)
By downloading production information of the machine as csv file, analyzed time study diagram is
shown.
Explanation of monitor information
1) Appoint period Set period to output.
2) Update Update screen data to show for the appoint period.
3) CSV download Parts event information of the load within the appoint period is
downloaded as csv file.
How to use the downloaded csv file
Import the downloaded csv file on the support tool (excel macro program) then a following diagram is
generated.
①
①
②
②
③
③