Do you have a question about the KREYER Chilly and is the answer not in the manual?
Inspect the unit for transport damage upon arrival and unpack carefully.
Select a suitable installation site with adequate ventilation and protection from elements.
Add clear water and then food-safe glycol to the tank for freeze protection.
Connect the system water pipes/hoses to the chiller's inlet and outlet.
Remove air from the pump by opening the water outlet valve until a constant flow is achieved.
Connect the unit to the appropriate power supply, adapting the plug if necessary.
Close the unit lid during operation for proper cold air transfer.
Turn the main switch to the ON position to start the unit.
Set the desired cooling temperature using the controller interface.
Configure the PJ Easy regulator, including switching between Celsius and Fahrenheit.
Operate and configure the ELIWELL ST 120 temperature regulator.
Change the temperature display unit for the ELIWELL ST 120 regulator.
Install the optional overflow protection kit for open water systems.
Adjust the differential pressure switch for proper pump operation.