OPERATION PROCESS GP800 UPS
- 16 -
OUT
IN
BATT
B
Y
FAULT
Off
Down
On
Sw itch ON
Cycle display button
LCD
Fault indicator
Bypass indicator
Output indicator
battery energy indicator
Input indicator
Switch OFF
5 OPERATION PROCESS
5.1 Prepare before start-up.
To make UPS normally and correctly run, please confirm the following
items. (Refer to figure 2)
3. Verify power switch on back panel is on the “OFF” position.
4. Verify the installation position again. (Figure 4 to 10)
5. Rock power cable by hand and see if there is any looseness, retighten
them if looseness.
6. Do not connect load.
7. Inspect if input voltage meet the demand of UPS (220V±10%) with
ammeter.
5.2 Operation process for first start-up
After verify the above items are correct, please turn on UPS according
to the following ways:(Please refer to figure 1, figure 2, figure 3)
1. Please switch power switch “NON- FUSEBREAKER”
(NFB) on the back
panel to the “ON”
position. All indicator
light are off. As right
figure.
Figure 18