813-POINT HITCH & DRAWBAR
The 3-point hitch with quick-hitch consists of a pair of
lower links and a top link, all of which have claw ends that
permit rapid attaching and detaching of implements.
C Installing Ball-joint to Implement
Before the implement is installed on the 3-point hitch with
quick hitches, it is necessary to install the ball-joints to the
implement according to the following instructions.
C Adjusting Lower Link Width
Set the width (W1) of lower links to be the same as width
(W2) of the implement.
(See "Telescopic Stabilizers" in this section to adjust the
width (W1) of lower links.
C Attaching implement to Tractor
1. Set the release lever on the quick hitches to "LOCK"
position, if its lever is in "UNLOCK" position.
(Self-locking latches are closed)
2. With the lower links fully lowered, reverse the tractor
until the quick hitches are beneath the implement ball-
joints.
3. Raise the lower links using the hydraulic control lever
until the quick hitches engage the ball-joints.
A An audible click will be heard as the self-locking
latches engage the implement ball-joint.
4. Lower the top link hook onto the upper implement ball-
joint and press down until the latch is engaged. If
necessary, adjust the top link length.
A The hook of a top link is attached in a downward
direction.
(1) Plain ball-joint (for upper hitch pin)
(2) Ball-joint (for lower hitch pin)
(1) Lower link
(2) Telescopic stabilizer
(3) Implement