Putting into service
Control box
RPB
19
$Putting into service
1. Switches on the control box
- Press key (1) to switch the control box on.
- Press key (1) for 2 seconds to switch the control box
off.
2. Standby mode
The control box RPB switches to the standby mode
when not used for a few minutes.
- Press on a key to exit the standby mode.
1