EasyManua.ls Logo

KYMCO Mongoose 50-2T

KYMCO Mongoose 50-2T
258 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. IGNITION SYSTEM
15-8
PULSER COIL
INSPECTION
Disconnect the A.C. generator connector.
Measure the pulser coil resistance between
the blue/yellow and green wire terminals.
Resistance:
90cc/70cc/50cc-4-T: 100140/20°C
50cc-2T: 80160/20°C
Note: The readings in this table are taken
with a YF-3501 Tester.
REMOVAL
Refer to chapter 14 for the A.C. generator
removal.
IGNITION TIMING
INSPECTION
Remove the fan cover.
Warm up the engine and check the ignition
timing with a timing light.
When the engine is running at the ignition
timing is correct if the “F” mark aligns with
the index mark within ±2°.
Ignition Timing:
90cc: BTDC28°/4000rpm
70cc: BTDC13°/1800rpm
50cc-4T: BTDC13°/2000rpm
50cc-2T: BTDC15°/1700rpm
Advance Mark
“F” Mark
This test is performed with the stato
r
installed in the engine.
Pulser Coil Lead
The CDI unit is not adjustable. If the
ignition timing is incorrect, inspect the
CDI unit, pulser coil and A.C. generator
and replace any faulty parts.

Table of Contents

Related product manuals