2. Provide standard/phillips screwdriver (5) (tool kit)
and pass the
through the axle hub (4) and driven sprocket
holder (3) holes.
3. To the chain, push the ATV forward.
To the chain, pull the ATV backward.
4. Retighten
to the specification.
5. Pull out the .
standard/phillips screwdriver
loosen
tighten
the two axle hub holder bolt and hub
stopper bolt
standard/phillips screwdriver
Tightening torque:
Axle hub holding bolt
40 Nm (4.0 m-kg, 29 ft-lb)
Hub stopper bolt:
12 Nm (1.2 m-kg, 9 ft-lb)
Tighten
Loosen
(3)
(4)
(5)
(3) Driven sprocket holder (4) Axle hub
(5) Standard/phillips (tool kit)
163