Rigging procedures
Flying Syva
type of deployment own
rigging accessories Syva Bar
CLAMP250 (optional)
tools torque screwdriver
T30 Torx bit
additional material 1 Ø12 mm shackle WLL 1 t (provided)
min number of operators 1
Secondary safety
Secure a DIN-580 eye bolt to the dedicated insert on the enclosure to implement a secondary safety.
Access to the screw terminal is limited after rigging.
Prepare the cabling before rigging the system.
About this task
Available site angles:
+5°+2°0°-2°-5°-7.5°-10°
Procedure
Remove the backplate from Syva and secure Syva Bar on the enclosure.
Store plates and unused screws in Syva Cov.
T30
T30
5 N.m
Syva rigging manual (EN) version 1.1 22