EasyManua.ls Logo

Lagoon 51 - Page 56

Lagoon 51
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
- Keep the chain locker panel or hatch closed at sea.
- Towing must always be carried out at low speeds.
- A tow must be taken in such a way that it can be released when loaded.
- The owner must ensure that mooring and towing ropes as well as fastening points and chains correspond to the condition of
use of the boat.
5
56
LAGOON51
Taquetsd’amarrageprincipaux
Amarrage Remorquage
Taquetsd’amarrageprincipaux
Taquetsd’amarrageprincipaux
Chaine:80m
Ancre:45Kg
5. Anchoring, mooring and towing
MAIN MOORING CLEATS
CHAIN: 80 METRES
ANCHOR: 45 KG
WARNING
If the boat is fitted with non-metallic strong points,
their limited lifetime must be taken into account.
This means that they will have to be replaced as soon as
they show any signs of damage, visible surface cracks or
permanent distortion.
NOTE: Dark-coloured elements are less sensitive to UV light
than light-coloured elements.
MAIN MOORING CLEATS
MAIN MOORING CLEATS
MAIN MOORING CLEATS

Related product manuals