EasyManua.ls Logo

Lantronix MPS100

Lantronix MPS100
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MPS/LPS User Guide 2: Installation
2-3
5.
Allow 45 seconds for the unit to fully boot. The LINK LED will
be lit if there is a valid network connection. The ACT LED gives
information about what the MPS is doing; for example, when
code is being downloaded as the unit boots, the LED will blink
green quickly. If you have connected a 100BASE-T cable
(MPS100 only), The Link and 100MBit LEDs should both be
solid green. If not, check your network connection.
6. Print a Test page by pressing the Test/Reset button.
Note: If the Power LED does not light or the Test page does not
print, refer to Appendix B:Troubleshooting.

Table of Contents

Other manuals for Lantronix MPS100

Related product manuals