Maintenance
Maintenance
5
5-2 425HD-MD/masterdoc101602 Maintenance
5.1 Maintenance
Along with completing the Pre-Operation Equipment Inspection Checklist each time
you operate the Articulator, complete the following Maintenance Checklists at the indi-
cated time intervals: See also Maintenance chart located in section 5.13
5.2 Every 8 Operating Hours or Daily
Complete the Pre-Operation Equipment Inspection Checklist.
Grease all grease zerks.
Inspect the spindle bearing grease seals (under each deck) for grease leakage or
improper seating.
Lubricate all joints and moving parts which are not equipped with grease fittings.
(Use anti-seize for these areas).
Verify that all cables & hardware are functional, securely fastened and in good con-
dition. Calibrate cables if needed.
Verify proper installation, operation, and flow of grass chute.
Inspect entire Articulator for loose or entangled parts, debris, obstructions,
neglected tools, or any other possible safety hazards, equipment hazards or projec-
tile hazards.
Proper maintenance of the Articulator is important!
ALWAYS perform the appropriate Maintenance checklist at the proper
time interval!
Failure to complete the appropriate Maintenance checklists at the
proper time intervals will cause damage to the Articulator, unsafe
operating conditions, and substandard performance!
Warranty issues are dependent upon proper maintenance!
NEVER allow children to operate the Articulator!
NEVER allow children on or near the Articulator!
NEVER operate the Articulator when children are present!
NEVER perform maintenance to the Articulator when children are
present!