BAODING LEAD FLUID TECHNOLOGY CO.,LTD.
:
:
8
Loading tubing for YZ15/YZ25/YT15/YT25 pump head
1. Be sure the pump drive is turn off.
2. Pull the pull rod to the horizontal position, left the sliding block.
Loading the suitable tube.
●YT15, YT25 pump heads only in the first installation tube need to a fine tuning
knob adjustment. First put the pressure tube clearance knob to the loose state
by counterclockwise.YZ15, YZ25 pump heads pressure tube clearance is
cannot adjust.
●Throw up on one side of the tubing clamp, put tubing in, then pull another side
tubing clamp, put the tubing into the other side.
●Tension with both hands on both ends of the tube, make it natural stretch, no
distortion, no deviation.