EasyManua.ls Logo

LEGRAND DAKER DK Plus 3 101 73 - Page 60

LEGRAND DAKER DK Plus 3 101 73
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
Follow this procedure to change the buzzer setting:
- press . The buzzer setting is displayed;
- press to select ON or OFF;
- confirm the choice by pressing .
The battery test can be performed to check the optimal operation of the batteries. The test can be
performed only after the batteries are fully charged, the input line is present and the UPS is pow-
ering the loads. Follow this procedure to perform the battery test:
- press ;
- press to display the battery test setting;
- press to select ON. The UPS transfers to stored energy mode for 10 seconds. During the test,
the loads are always powered with no voltage dip;
- if at the end of the test the UPS transfers back to normal mode without any alarm code, the bat-
teries are still working properly.
To change all the other settings, the UPS must be in standby mode. In this condition the loads are
powered. Therefore all the needed settings must be performed before turning on the external
output breaker.
Follow this procedure to change the UPS settings:
- press simultaneously and for approximately three seconds, until the buzzer sounds
twice. The LCD displays the first setting (“buzzer”);
- all the different settings can be scrolled pressing ;
- except for the buzzer and the battery test, all the other settings may be changed by pressing
;
- after changing settings, scroll to the “End” screen and then press to save all changes;
- the UPS restarts automatically. However, it is also suggested to remove the mains for at least 30
seconds.
4 Operation

Table of Contents

Related product manuals