Step 3. Press the release tab toward the handle and carefully pull the handle at the same time to slide the
hot-swap power supply out of the chassis.
Note:
Slightly pull the power supply upwards when sliding the power supply out of the chassis, if you
have installed one of the following CMA kits:
2U CMA Upgrade Kit for Toolless Slide Rail
Toolless Slide Rail Kit with 2U CMA
Figure 22. Hot-swap power supply removal
After removing the hot-swap power supply:
1. Install a new power supply or install the power-supply filler to cover the power supply bay. See “Install a
hot-swap power supply” on page 55.
Important: To ensure proper cooling during normal server operation, both of the power supply bays
must be occupied. This means that each bay must have a power supply installed; or one has a power
supply installed and the other has a power supply filler installed.
2. If you are instructed to return the old hot-swap power supply, follow all packaging instructions and use
any packaging materials that are provided.
Install a hot-swap power supply
Use this information to install a hot-swap power supply.
Read the
installation
Guidelines” on
page 41
ATTENTION:
Static Sensitive Device
Ground package before opening”
on page 43
The following tips describe the type of power supply that the server supports and other information that you
must consider when you install a power supply: