EasyManua.ls Logo

LEYBOLD ScrewLine SP250 - Supplied Equipment

LEYBOLD ScrewLine SP250
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Description
27
GA02412_002_C0 - 10/2016 - © Leybold
1.3 Supplied Equipment
Die SP 250 is supplied ready for installation and connection.
The pump is delivered with:
An integrated motor.
Installed SP-Guard with 20 meter connection cable.
The required amount of gear oil (is supplied separately).
An intake screen preventing the ingress of small objects into the intake of
the pump.
2 crane eyes for transporting the pump.
2 cable fittings for the junction box
Square key for disassembly/assembly of the cover and for opening the fan
housing.
Operating Instructions
Intake and discharge ports are sealed with foil. Remove this foil and also the
desiccant inside before switching on the pump.
For the purpose of shipping the pump, the pump has been affixed to a spe-
cial pallet. Retain this pallet in case the pump needs to be returned.

Table of Contents

Related product manuals