INSTALLATION
Installing the Charging
Station
Self-Standing Installation
Follow the steps below to install the charging
station on a hard and level floor.
1
Place the floor stand dock on a hard and level
floor and assemble the floor stand pipe.
2
Clip the power cord tidily into the cord keeper
a
on the back of the floor stand pipe.
3
Slide the detachable nozzle storage onto the
floor stand pipe.
Make sure not to pinch or tangle the power
cord behind the mop pads storage.
4
Assemble the charging station onto the top of
the floor stand pipe.
5
Connect the power adapter to the port on the
back of the charging station.
6
Drill a hole in the wall and insert the drywall
anchor
b
if needed.
Before drilling, make sure that there are no
pipes or electrical wires inside the wall at the
desired location.
For drywall anchor: use 1/4 (6.5 mm) drill bit
For concrete or wall stud: use 1/8 (3 mm)
drill bit
If screwing into drywall, use the drywall
anchor.
7
Align the wall anchoring block
c
of the
charging station, and fix the charging station

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG A9K Series and is the answer not in the manual?

LG A9K Series Specifications

General IconGeneral
Battery TypeLithium-Ion
Charging Time4 hours
Telescopic WandYes
Power SourceBattery
TypeStick Vacuum Cleaner
Dust Capacity0.44 L
Weight2.7 kg
Filter TypeHEPA Filter
Filtration System5-step filtration
Nozzles IncludedCrevice Tool
Features5-Step Filtration System
CategoryStick Vacuum Cleaner
Washable ComponentsFilter
ModelA958SA, A957SA, A957SMA, A958SMA, A958TSA, A958XMS, A958XHS (and other A9K series models)

Related product manuals