EasyManua.ls Logo

LG GHD30 - 3.4 Refrigeration System Replacement

LG GHD30
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.4
HOW
ТО
REPLACE
THE
REFRIGERATION
SYSTEM
1.
When
replacing
а
refrigeration
component,
be
зиге
to
discharge
the
refrigerant
system
by
Using
a
refrigerant
recovery
system.
2.
After
discharging
the
unit
completely,
remove
the
desired
component,
and
unbraze
the
pinch-off
tubes.
3.
Solder
service
valves
into
the
pinch-off
tube
ports,
leaving
the
valves
open.
4.
Solder
the
pinch-off
tubes
with
service
valves.
5.
After
doing
the
above
procedures,
the
valve
must
be
closed
and
left
in
place
on
the
system
for
any
subsequent
procedures.
6.
Evacuate
as
follows.
1)
Connect
the
vacuum
pump,
as
illustrated
in
Figure
31A.
2)
Start
the
vacuum
pump,
slowly
open
manifold
valves
A
and
B
two
full
turns
counterclockwise
and
leave
the
valves
open.
The
vacuum
pump
is
now
pulling
through
valves
A
and
B
to
valve
C
by
means
of
the
manifold
and
entire
system.
If
high
vacuum
equipment
із
used,
just
crack
valves
A
and
B
for
a
few
minutes,
then
open
slowly
with
the
two
full
turns
counterclockwise.
This
will
keep
oil
from
foaming
and
being
drawn
into
the
vacuum
pump.
3)
Operate
the
vacuum
pump
for
20
to
30
minutes,
until
600
microns
of
vacuum
are
obtained.
Close
valves
A
and
B,
and
observe
vacuum
gauge
for
a
few
minutes.
A
rise
in
pressure
would
indicate
a
possible
leak
or
moisture
remaining
in
the
system.
With
valves
A
and
B
closed,
stop
the
vacuum
pump.
4)
Remove
the
hose
from
the
vacuum
pump
and
place
it
on
the
charging
cylinder.
See
Figure
31B.
Open
valve
C.
Discharge
the
line
at
the
manifold
connection.
5)
The
system
is
now
ready
for
final
charging.
7.
Recharge
as
follows
:
1)
Refrigeration
cycle
systems
are
charged
from
the
High-side.
If
the
total
charge
cannot
be
put
in
the
High-side,
the
balance
will
be
put
in
the
suction
line
through
the
access
valve
which
you
installed
as
the
system
was
opened.
2)
Connect
the
charging
cylinder
as
shown
in
Figure
31B.
With
valve
C
open,
discharge
the
hose
at
the
manifold
connection.
3)
Open
valve
A
and
allow
the
proper
charge
to
enter
the
system.
Valve
B
is
still
closed.
4)
If
more
charge
is
required,
the
high-side
will
not
take
it.
Close
valve
A.
5)
With
the
unit
running,
open
valve
B
and add
the
balance
of
the
charge.
a.
Do
not
add
the
liquid
refrigerant
to
the
Low-
side.
b.
Watch
the
Low-side
gauge;
allow
pressure
to
rise
to
30
Ibs.
Turn
off
valve
B
and
allow
pressure
to
drop.
.
Repeat
steps
B
and
C
until
the
balance
of
the
charge
is
in
the
system.
6)
When
satisfied
the
unit
is
operating
correctly,
use
the
pinch-off
tool
with
the
unit
still
running
and
clamp
on
to
the
pinch-off
tube.
Using
a
tube
cutter,
cut
the
pinch-off
tube
about
2
inches
from
the
pinch-off
tool.
Use
sil-fos
solder
and
solder
pinch-off
tube
closed.
Turn
off
the
unit,
allow
it
to
set
for
a
while,
and
then
test
the
leakage
of
the
pinch-off
connection.
ао

Related product manuals