EasyManuals Logo

LG Multi V ARUB Series User Manual

LG Multi V ARUB Series
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #104 background imageLoading...
Page #104 background image
104 Outdoor Unit
Integrated Test Running Function_Heating Mode (Setting 4)
Start
Yes
No
Note 1
Note 1
Error Display
End
Completed
Press the black button for 2 sec.
after turning off all of Dip switch.
Error Display
1 IDU operation
1 IDU operation data(10min)
All IDU operation data(10min)
Temp. Condition
Press the black button for 2 sec.
This function is checking process for normal operation of parts and system On operating system.
All processes carry out included refrigerant amount judge logic and check normal condition of parts on heating mode.
This function check only normal condition of parts on heating mode.
• Saved data can check using LGMV.
Note
1. Judge the normal condition refer to report of Test Running.
DIP Switch Settings
Warning : Please reset SUB PCB before starting this function
Test Run

Other manuals for LG Multi V ARUB Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG Multi V ARUB Series and is the answer not in the manual?

LG Multi V ARUB Series Specifications

General IconGeneral
BrandLG
ModelMulti V ARUB Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals