EasyManua.ls Logo

LGMG AS0607 - Battery Inspection (Checklist B)

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER MANUAL - SS0407E / SS0507E / SS0607E / AS0607 / AS0607W / AS0607WE / AS0607E / AS0608 / AS0608E
45
Chapter 11 - Maintenance
A-4 Maintenance of 30 days
The 30 day maintenance is made 30 days after or the rst 40 hours after machine operation. After this step, continue
to check the maintenance items on the checklist.
Maintenance must be carried out in accordance with the steps below:
1) B-3 Tyre and rim
2) D-2 Replacement of hydraulic oil lter core
11.10 Steps of checklist B
B-1 Battery inspection
1) This control item must be carried out every 250 hours or every quarter, whichever comes rst.
2) A good battery status is essential for machine performance and operating safety. An incorrect electrolyte
liquid level and a damaged cable or control can damage a machine component and pose a risk.
Electrocution Risk
Live operation may result in serious injury or death. Remove rings, watch and other personal jewellery for the
operating process.
Risk of personal injury
The battery electrolyte is corrosive. Do not expose hands or other parts of the body to leaking electrolyte, in order to
avoid
injury. Neutralise the discharged electrolyte with a sodium bicarbonate solution.
1) Wear protective clothing and safety glasses.
2) Release the lock on the chassis side of the battery drawer and turn the chassis battery outwards.
3) Protect the battery control cable from erosion.
Reminder: Add a wiring end and apply anti-corrosion adhesive to protect the battery control cable from erosion.
4) Attach the battery and cable securely.
5) Fully charge the battery and leave it for at least 24 hours. Use the non-maintenance free battery and the
sealed battery:
6) Open the battery cover, check the specic weight with a special gravity hydrometer and record the
registration.
7) Check the ambient temperature and adjust the specic uid gravity of each battery according to the
instructions below:
Increase specic liquid gravity by 0.004 per 5°C, if temperature exceeds 27°C.
Lower specic uid gravity by 0.004 per 5 ° C, if the temperature is lower than 27 ° C.
Result: the specic liquid gravity of each battery is higher than 1,277 after adjustment.
Fully charge the battery and go to step 12. Result: If the specic liquid gravity of each
battery is lower than 1,250 go to step 9.
8) Charge the battery pack in a balanced way and leave it for at least 6 hours (preferably 24 hours).
undisturbed.

Other manuals for LGMG AS0607

Related product manuals