EasyManua.ls Logo

LI-COR LI-830 - Pump Operation

LI-COR LI-830
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 2. Configuring the gas analyzer
Using the Pump
For instruments that are equipped with the LI-COR-installed pump, the pump is
activated through the interface.
Note: The pump will not run until the optical cell has reached the operating
temperature of about 50 °C, regardless of the setting. If the cell temperature
drops below 50 °C, the instrument will disable the pump temporarily until the
cell warms back up.
To turn on the pump from the main window, click the pump button so it reads
Pump: On. Or, click Settings > Instrument and check Enable pump.
2-10 Using the LI-830 and LI-850 Gas Analyzers

Other manuals for LI-COR LI-830

Related product manuals