EasyManua.ls Logo

Lifetime VISTA - Deflation; Fin Assembly

Lifetime VISTA
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
DEFLATION
2
TO DEFLATE THE PADDLEBOARD:
With the valve cap removed, push the valve head down and turn it 90°
counterclockwise so that the valve head remains in the open (down) position.
Press Head Down
and Turn 90°
Valve Head closed
(for inflation)
Valve Head open
(for deflation)
The Detachable Fin is recommened for
use in deeper water. Do not use this fin
in shallow water, as it could damage the
bottom of the board.
FIN ASSEMBLY
3
• Slide the Detachable Fin (DNT) into position in the fin housing on the bottom of the
Paddleboard. The Fin should point towards the back of the board. Once the Fin is
in place, push the locking pin into place.
The Fin can be installed on the
paddleboard while inflated or
deflated.
!
!

Related product manuals