Scheduled Maintenance and Inspection
Checklist
Use the checklist on the following page to create
a record of all scheduled inspections and/or
maintenance that is performed on the material lift.
Make copies of the checklist as needed and keep
a permanent record of all inspections and
maintenance performed on the material lift.
Mark the appropriate box to indicate whether a
daily, quarterly, or annual inspection is being
performed.
When performing a quarterly inspection, also
perform a daily inspection.
When performing an annual inspection, always
perform a quarterly inspection and a daily
inspection.
Mark the appropriate box beside each inspection
procedure: A for acceptable or U for
unacceptable.
If U (Unacceptable) is marked for any inspection
procedure, tag the material lift, and remove it from
service until repairs are completed according to
manufacturer’s specifications.
After making repairs to a damaged material lift,
ALWAYS perform a new full inspection before
returning the material lift to service.
Only authorized and trained personnel should
perform maintenance on the material lift.