EasyManua.ls Logo

LiftSmart MLC - Page 73

LiftSmart MLC
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MLC Construction Pro Series
Part Number M00969C
Parts & Service Manual
Copyright © 2022 LiftSmart
71
Scheduled Maintenance and Inspection Checklist
Model
Serial Number
Inspection Location
Inspector Name (Print)
Inspector Title
Inspector Signature
Date
Mark the appropriate box to indicate whether a daily, quarterly, or
annual inspection is being performed.
Daily Inspection
Quarterly Inspection
Annual Inspection
When performing a quarterly inspection, also perform a daily
inspection. When performing an annual inspection, always
perform a quarterly inspection and a daily inspection.
Mark the appropriate box beside each inspection procedure: A for
acceptable or U for unacceptable.
NOTES:
Daily Inspections
A
U
Operator’s Manual
Visual Inspection
Function Test
Quarterly Inspections
A
U
Inspect the Welds
Clean the Masts
Inspect the Winch
Lubricate the Winch
Annual Inspections
A
U
Lubricate Casters and Wheels
Inspect the Mast Assembly for Wear
Replace the Brake Lining Plates on
the Winch
Inspect the Paint on the Material Lift
If U (Unacceptable) is marked for any inspection procedure, tag
the material lift, and remove it from service until repairs are
completed according to manufacturer’s specifications.
After making repairs to a damaged material lift, ALWAYS perform
a new full inspection before returning the material lift to service.
Only authorized and trained personnel should perform
maintenance on the material lift.