EasyManua.ls Logo

Linak DL12

Default Icon
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 6 of 36
Before installation, reinstallation, or troubleshooting
Stop the DB/DL
Switch off the power supply and pull out the mains plug.
Relieve the DB/DL of any loads, which may be released during the work.
Before start-up:
Make sure that the system has been installed as instructed in this User Manual.
Make sure that the voltage at the control box is correct before the system is
connected to the mains.
System connection. The individual parts must be connected before the control box
is connected to the mains. See the User Manual for LINAK actuators, if necessary.
During operation:
If the control box makes unusual noises or smells, switch off the mains voltage
immediately.
Take care that the cables are not damaged.
Unplug the mains cable on mobile equipment before it is moved.
Misc.
The actuator system has a sound level below 55dB(A) in typical applications.
Updated manuals and declarations can always be found here:
www.linak.com/deskline