EasyManua.ls Logo

LIVOLTEK Hyper 3000 - Page 48

LIVOLTEK Hyper 3000
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
Wiring Connection Procedure
Notes: Assemble the communication module and plug it into the communication terminal
directly if you are not going to use the communication functions.
Step 1: Prepare the communication cable and remove the plug of the communication
terminal.
Step 2: Dismantle the communication module and take out the pin terminal. To avoid
water and dust, keep the rubber plug to seal the unused holes.
Step 3: Insert the communication cable into the corresponding pins terminal to realize the
RS485 communication function.
Step 4: Assemble the communication module and plug it into the communication terminal.
6.9.1 CT Connection
The hybrid inverter is equipped with the feed-in power limit function, so as to meet the
requirements of some national standards or grid standards for the output power at the grid
connection point. For the setting of feed-in power limit, refer to the section “Feed-in
Limitation”
The CT (Current transformer) in the package of inverter is compulsory for this hybrid
system installation. Which measures the value and direction of AC current. Thanks to its
built-in metering chip, the hybrid inverter enables the export power to the grid does not

Other manuals for LIVOLTEK Hyper 3000

Related product manuals