Before start-up
- 42 - 10.13
12.1 Connecting the torch
 Connect the central connector 17 of the
torch to the central socket 11.
17
11
Abb. 2: Connecting the torch
12.2 Connecting the ground cable
 Connect welding return cable 18 to con-
nector 10 and secure it by turning it clock-
wise.
10
18
Abb. 3: Connecting the ground cable
12.3 Fastening the ground clamp
Abb. 4: Correct
 Attach the ground clamp immediately be-
side the welding point so that the welding
current will not try to nd its own return
path through machine parts, ball bearings
or electric circuits.
 Connect the ground clamp rmly to the
welding bench or the workpiece.
Abb. 5: Incorrect
Do not place the ground clamp on the
welding machine or the gas cylinder; oth-
erwise the welding current will be carried
via the protective conductors and it will
destroy these.