EasyManuals Logo

LRS SCINTREX AUTOGRAV CG-6 User Manual

Default Icon
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Getting started
CG-6 Operation Manual p/n 115370001 Rev A
27
Warm-up period: after you power up the CG-6 Autograv
TM
, it requires a 2 hour warm-
up time in order to reach the operating temperature.
Stabilization period: the instrument requires a 24 hour period after you power up to
stabilize.
Setting up the instrument for field operations: Once the steps have been performed
or attained, your CG-6 Autograv
TM
is ready for field use. For more details on the set up,
please refer to the next chapter entitled: Setting up your CG-6 Autograv
TM
.
Powering up the CG-6 Autograv
TM
The CG-6 Autograv
TM
can be powered either by:
• The 15V DC external power supply, or
Figure 2-8 Connecting the power supply to the CG-6 Autograv
TM
by the two internal Smart Batteries supplied with the CG-6 Autograv
TM
.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LRS SCINTREX AUTOGRAV CG-6 and is the answer not in the manual?

LRS SCINTREX AUTOGRAV CG-6 Specifications

General IconGeneral
BrandLRS
ModelSCINTREX AUTOGRAV CG-6
CategoryMeasuring Instruments
LanguageEnglish