EasyManua.ls Logo

Lucent Technologies PARTNER Advanced Communications System - Adding New Modules

Lucent Technologies PARTNER Advanced Communications System
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
44
5 Check that all green lights on the
fronts of the modules are lit:
a.
If a single light is out
, power down
the control unit, reseat the module,
then power up the control unit.
b.
If multiple lights are out
, power
down the control unit, reseat the
leftmost module that has a light
out, then power up the control unit.
c.
If the lights are still out
, call for
support as instructed on the inside
front cover of this guide.
6 a. Make sure all modules are seated
properly. The cover will not fit if the
modules are not seated properly.
b. To replace the cover, grasp it by its
upper edges and hold it squarely
over the control unit.
c. Place the cover over the modules
and make sure it fits firmly in
place.
d. Tighten the screw on the lower
front of the cover.
Adding New Modules
NOTE:
Use these instructions if you are adding modules to an existing 5-Slot
Carrier. If you are upgrading from a stand-alone PARTNER ACS processor
module to a 2-Slot Carrier, see “Wall-Mounting a 2-Slot Carrier and
Modules” earlier in this guide for instructions.
!
WARNING:
!
Before starting, verify that you have batteries installed in the PARTNER ACS
processor module, and then disconnect the power cord from the power jack on
the processor module. For an illustration showing the location of the power
jack, see “Initializing the System” in this guide.
L
I
N
E
S
PFT
L
I
N
E
S
PFT
Lights

Other manuals for Lucent Technologies PARTNER Advanced Communications System

Related product manuals