4-6
CDD3000-HF Operation Manual
4 Commissioning
4.3 Initial
commissioning
Preconditions:
The CDD3000-HF is fully connected; see Section 3
Installed D
RIVEMANAGER version V3.4 or higher
Motor database for LUST servomotors is installed on the PC
Device is connected to PC via RS232 interface (X4)
Attention: Never wire or disconnect electrical connections while they are
live!
Before working on the device disconnect the power. Wait for
the DC-link capacitors to discharge. Work may only be
carried out on the device when the residual voltage (between
terminals L+ and L-) is below 60 V!
Connect input ENPO = Low level at terminal 7 (X2) to prevent
unintentional startup of the motor (power stage disabled, CDD3000-HF
power on).
Preparations:
Switch on the CDD3000-HF.
A self-test is carried out.
Start the D
RIVEMANAGER.
Connect to the device.
D
RIVE
M
ANAGER
Connect
or:
Communication > Connect...