EasyManuals Logo

Mahindra XUV700 2021 User Manual

Mahindra XUV700 2021
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8
The repair methods given by the manufacturer in this document are based on the technical specifications, current at the time of release. The methods may be modified as a result of changes introduced by the
manufacturer in the production of the various component units and accessories from which the vehicles are manufactured. The reproduction, translation, transmission, in part of or whole of the present document, are
prohibited without the prior written consent of Mahindra & Mahindra Ltd. The use of this document by any person other than the trained personnel, at the Authorized Service Centre of Mahindra & Mahindra Ltd., will
amount to unauthorized use and shall be liable for penalty/prosecution© 2021 Mahindra & Mahindra Ltd.
3 STANDARD TEST PROCEDURE
TESTING OF VOLTAGE POTENTIAL
Connect the ground lead of a voltmeter to a known good ground or battery ground
Connect the other lead of voltmeter to selected test point. The vehicle ignition may need to
be turned ON to check voltage.
TESTING FOR CONTINUITY (RESISTANCE)
Disconnect the power supply (battery, ignition switch OFF)
Set the Multimeter Mode selector to measure resistance
Connect one lead of the multimeter to one side of the circuit being tested
Connect the other lead to the other end of the circuit being tested. Low or no resistance
means good continuity
M
v
M
Ω
Diagnostic Manual
XUV700 (Diesel)
UICU
MAN-01065
OCT - 2021/Rev 1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mahindra XUV700 2021 and is the answer not in the manual?

Mahindra XUV700 2021 Specifications

General IconGeneral
BrandMahindra
ModelXUV700 2021
CategoryAutomobile
LanguageEnglish

Related product manuals