CONTROLS
1... Plug for remote control
2... Vibrator switch
3... Switch for Remote Control – Hand – Injec-
tion
4... Hour meter
5... Phase reversal plug for power supply
6... Plug for main motor
7... Fault indicator
8... Switch for water pump ON – OFF – AUTO
(Optional)
9... Main switch
10... Button and indicator for water injection
11... START button
12... STOP button
13... REVERSE button
DIRECTIONS BEFORE
START-UP
To guarantee trouble-free start-up, ensure that all
the components have been cleaned properly and
are in perfect condition. Check that the machine is
horizontal and stable so that it cannot slip if moved
accidentally.
Check that all the cables and safety devices are
functioning correctly.
Ensure that the machine is horizontal and standing
safely.
Check that all the components have been mounted
properly.