EasyManua.ls Logo

Man D 2866 LUE 605 - Light Signal Transmitter Method

Man D 2866 LUE 605
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
6
7
Checking and adjusting start of fuel delivery
26
Fig. 5
Remove screw plug À on governor housing.
If fitted, take out blocking pin Á.
Caution:
If the injection pump is blocked the cam-
shaft must on no account be loaded or
turned because parts of the blocking pin
may break off and fall into the governor.
Non-compliance with this may result
in severe damage to the injection
pump.
If the pointer is exactly in the centre of the inspec-
tion hole, the pump plunger for cylinder no. 1 is at
start of delivery. However, it is possible to deter-
mine exactly whether or not the pump is at start of
delivery only by means of the following special
tools:
1. Light signal transmitter
Fig. 6
Push light signal transmitter into socket in gover-
nor housing. Ensure that the lug fits in the groove.
Tighten the knurled nut by hand.
Turn engine by hand so that piston in cylinder no.
1 in the compression stroke comes close to the
start of delivery.
Lamp (A) comes on shortly before start of delivery
is reached.
Fig. 7
Slowly turn the engine further until lamp (B) comes
on too. The injection pump is now at start of
delivery.
Note:
If only lamp (B) comes on during this
test, the engine has been turned past the
start of delivery. In this case turn the en-
gine back and repeat the procedure.
If only lamp (B) comes on during this test, the en-
gine has been turned past the start of delivery. In
this case turn the engine back and repeat the pro-
cedure.

Table of Contents

Related product manuals